The Program
One Corridor, Several Contracts.
Corridor programmes are let in packages, and the seams between those packages are where schedule and cost quietly leak. Each contractor is meeting their own obligations; nobody owns the space between them.
PMG placed inspectors and schedulers across the packages who reported to TxDOT rather than to a package, which is how the corridor was managed as one programme instead of several projects that happened to be adjacent.
On The Ground
3 PhotographsWide shot
Detail
Detail
On site
On site
On site
Selected Work
More Transportation Programs
Project photograph
TransportationDallas, TXSilver Line Corridor Improvements
Dallas Area Rapid TransitView Project
Project photograph
TransportationHouston, TXMETRO Bus Operating Facility Renewal
Houston METROView Project
Project photograph
AviationHouston, TXTerminal C North Concourse Modernization
Houston Airport SystemView Project